Delivery of the pool
The pool is brought to its destination in a pre-arranged time and about 30 minutes before the arrival of a crane. It is necessary to lay insulation and to prepare the excavation for the pool placement.
Pool and filtration connecting
After placing the pool in the excavation (on the thermal insulation – Styrodur) filtering technology is mounted and its pipes are ready to be connected.
![]() |
![]() |
![]() |
After the assembly of filtering technology, pressure test of pipes is made to check for leaks. Then the pool is ready for the concreting of side walls.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |